Advanced search
54
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

Simultaneous versus sequential scheduling of multiple resources which constrain system throughput

Pages 21-33
Published online: 14 Nov 2010
 

The GOAL SYSTEMTM implements a drum-buffer-rope (DBR) approach to production scheduling. Earlier versions of the software were only capable of building a schedule for one constrained resource at a time. If multiple resources constrained the overall system's capability, the schedules for these resources had to be created sequentially. However, the current version contains an ability to simultaneously create multiple constraint schedules. A set of solutions was generated for benchmark problems developed in previous research. The new results were compared to solutions produced by the sequential algorithm, as well as solutions which optimally minimize maximum tardiness. The simultaneous algorithm was found to slightly reduce maximum tardiness, but performed worse with respect to average flow-time, percentage of tardy jobs and total days late.

 

Related research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.